69,500 SQ.M. DEVELOPED IN 12 MONTHS
SIGNIFICANT FEATURES
- Total Area: 69,500 sq.m.
- Project Cost - Rs.279 Cr
- The project is sprawled across the area of 125 acres and includes 69,500 sq. m. of construction with all infrastructure.
- It includes 2 football grounds, 2 hockey grounds, an indoor stadium and an Olympic sized swimming pool.
- It incorporates 10 km. of PQC (Pavement quality concrete) internal roads.
- The school encompasses a total of 47 structures including an auditorium with the capacity of 500 people
- The school was functional within a record breaking 11 months of construction
- Consultant: AJ Architects, Pune